Your Shopping Cart is empty.


Download sample
File Details
Published: 2026-09-24 20:36:13.005610 Category: People Type: Photo Model release: No
Share
       

Floating orange hard hats hover above a man signing a blank visitor book at a gritty data center construction site for safety marketing

Contributor: Ryzhkov
ID : 2204287155

TitleFilesize
Photo5376x3584


Buy on Adobe Stock

Keywords
server room, construction site, signing, person, technician, man, calm, yellow jacket, safety-gear, mud, industrial, template, levitation, surreal, safety, business, professional, copy space, background